Husqvarna TE 150i 2021 Owner's Manual page 137

Table of Contents

Advertisement

SERVICE WORK ON THE ENGINE 18
Insert the oil screen and mount the angle piece with a new
hose clamp.
Hose clamp plier (60029057000)
V01631-01
Mount throttle valve body
Remove the locking piece and position the subframe.
Info
Pay attention to intake flange
Join plug-in connector
Position and tighten clamps
Guideline
Screw, intake
flange/reed valve
housing
S03676-10
Mount and tighten screws
Guideline
Screw, sub-
frame
Remove screws
Mount and tighten screws
Guideline
Screw, sub-
S03674-10
frame
Finishing work
Remove the motorcycle from the lift stand. (
Install the fuel tank.
Install the right side cover. (
Add 2-stroke oil. (
Prime the oil pump.
Mount the seat. (
Install the air filter box cover. (
Install the main silencer. (
6
.
5
.
4
of the rear brake light switch.
3
of the throttle valve body.
M6
6 Nm (4.4 lbf ft)
1
.
M8
30 Nm (22.1 lbf ft)
2
.
2
.
M8
30 Nm (22.1 lbf ft)
(
p. 75)
p. 73)
p. 43)
(
p. 131)
p. 68)
p. 69)
p. 72)
®
Loctite
2701™
®
Loctite
2701™
p. 56)
135

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Te 150i eu 2021Te 150i us 2021F2103u9F2175u9

Table of Contents