Download Print this page

Advertisement

Quick Links

I
Installazione, uso e manutenzione
UK
Installation, use and maintenance
E
Instalación, uso y mantenimiento
P
Instalação, uso e manutenção
GR
Εγκατάσταση, χρήση και συντήρηση
RUS
Установка, эксплуатация и техническое обслуживание
STATUS UP2
p.
2
p. 12
p. 22
p. 32
σ. 42
стр. 52

Advertisement

loading
Need help?

Need help?

Do you have a question about the STATUS UP2 and is the answer not in the manual?

Questions and answers

Summary of Contents for EdilKamin STATUS UP2

  • Page 1 STATUS UP2 Installazione, uso e manutenzione Installation, use and maintenance p. 12 Instalación, uso y mantenimiento p. 22 Instalação, uso e manutenção p. 32 σ. 42 Εγκατάσταση, χρήση και συντήρηση стр. 52 Установка, эксплуатация и техническое обслуживание...
  • Page 2 Commissioning/ testing Commissioning and testing must be performed by an authorized Edilkamin Technical Assistance Centre. Failure to do so will void the warranty. Commissioning, as specified in standard UNI 10683 Rev . 2005 (section "3.2") consists in a series of controls performed on the installed fireplace in order to ascertain the correct operation of the system and its compliance to applicable regulations.
  • Page 3 THE TECHNOLOGY • AVAILABLE VERSIONS N natural convection V forced ventilation • CLEAN COMBUSTION SYSTEM: S.C.P. Ensures high thermal efficiency and clean emissions The system combines an innovative air distribution method of primary combustion (A) and post-combustion (B) the primary combustion air is fed into the firebox and is uniformly distributed over the embers.
  • Page 4: Specifications

    THE TECHNOLOGY • AIR INTAKE MECHANISM sensor to be placed heating air damper control the air is drawn in from the outside and mixed with the air on hot air outlet inside using a new wire controlled mechanism recessed in channel (see p.
  • Page 5: Installation Instructions

    INSTALLATION INSTRUCTIONS Important warnings Vorwort Floor opposite the hearth • The STATUS UP2 hearths must be Floors made with fuelling materials installed keeping to the following As well as that indicated in the pre- must be protected by a suf...
  • Page 6 The smoke channel must be made with - service only one hearth (chimney or Edilkamin will not be held responsible stiff steel or ceramic pipes, flexible stove). for costs deriving from demolition or metal or fibre-cement pipes are not allo-...
  • Page 7 INSTALLATION INSTRUCTIONS - build the frame with the fitting for Installing the hot air circulation outlet "B3" into the wall of the room system jacket of the fireplace absolutely must requiring heating be conducted into the indoor environ- - connect the two aluminium pipes to ment.
  • Page 8 INSTALLATION INSTRUCTIONS External air inlet (figures E-F-G) Transporting the fireplace In order to facilitate transportation, the It is absolutely necessary, without fireplace can be made lighter by remo- exception, to build a connection to the ving the following: outside with a cross-section of 300 cm² - counter weights, cast iron bottom, cast for the proper functioning of the fire- iron sides, cast iron hearth, the ash pan, the...
  • Page 9 INSTALLATION INSTRUCTIONS • the first side panel - ensure that the electrical wires do not Electric cable connections (fig. N) • front Panel In order to connect the electrical cables have any areas of contact with the - secure outlets (22) in the top part of to the control unit inside the mecha- prefabricated appliance and the smoke the frames after making a hole of...
  • Page 10 INSTALLATION INSTRUCTIONS Fan 12 then pushes the air through the Placement of damper control air Buttons air jacket of the fireplace, through ope- intake mechanism On/Standby to the right = Open ning 4f, where it is heated and then, with the fireplace on adjust the outdoor Automatic or manual through the aluminium pipes, exits air mixed with indoor air.
  • Page 11: Use Instructions

    Only use burning wood with minimum two installed years seasoning in an airy and dry roo m. In The STATUS UP2 hearth is able to work require a sufficient air flow, so that this cri- such case, the water content will result lower...
  • Page 12 Sequenza montaggio “GHISE FOCOLARE” • smontare il cielino(2c) pre-montato nel termocaminetto svitando le due viti • avvitare un fianco metallico ambidestro (2e) con la vite in dotazione • inserire i due fianchi in ghisa ambidestri (2b) (attenzione, restano instabili fino al montaggio del fondale 2a) •...
  • Page 16 942072-GB ..04.19/A w w w . e d i l k a m i n . c o m...

This manual is also suitable for:

809470