Datcon DT9102 B Operating Instructions Manual page 13

Intrinsically safe digital clock
Table of Contents

Advertisement

DT9102 B
Mounting with the
screw clamps
20180905-V1
2. Put on the enclosed seal onto the instrument case from
the rear side and fit it to the instrument holding frame
(Figure step 2).
3. Put the instrument into the prepared cut-out as much as
possible and check the fitting of the seal between case and
mounting surface.
4. Put on the enclosed screw clamps onto the sides of the
instrument case (Figure step 4.1 and 4.2).
Fix the instrument by turning the screws in clockwise
direction (Figure step 4.3).
Take care that pointed, sharp metal parts do not cause
accidents.
13

Advertisement

Table of Contents
loading

Table of Contents