6. EtherCAT Connection Procedure
This section describes the procedure for connecting the Controller with the Slave via
EtherCAT. The description assumes that the Controller is set to factory default.
6.1. Workflow
Take the following steps to operate the PDO communications via EtherCAT after connecting
the Controller with the Slave via EtherCAT.
6.2 Preparation for the Controller Setup
6.2.1 Creation of a New Project
6.2.2 Initial Settings of the Controller
6.3 Installation of ESI Files
6.4 EtherCAT Communications Setup
6.4.1 Communications Setup for the EtherCAT Master
6.4.2 Distributed Clock Setup
6.4.3 PDO Map Settings
6.4.4 Creation of an EtherCAT Network Information File
6.5 Controller Settings
6.5.1 EtherCAT Communications Check
6.5.2 Writing the User Program
6.5.3 Project Data Transfer
6.2. Preparation for the Controller Setup
Prepare the Controller settings.
Install Power PMAC IDE on the computer in advance.
6.2.1.
Creation of a New Project
10
▼
▼
▽
▽
▼
▼
▼
▼
▽
▼
▼
▼
Prepare the Controller settings.
Install the ESI file for the Slave into
PowerPMAC IDE.
Set up EtherCAT communications.
Set up the Controller.