Ii9 - Curtis ThermoPro G4 Series User Manual

1 gallon coffee brewing system
Hide thumbs Also See for ThermoPro G4 Series:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
Installation
Leveling
WARNING: Use the leveling legs to level the
brewer only. Do not use them to adjust brewer
height. Do not extend them higher than necessary.
1
Position the brewer on the counter top. Level it left to
right and front to back by turning the bottom of the
legs.
Connect the Water Supply
2
Flush the water supply line prior to installation to purge
3
the back of the brewer. Leave the water supply valve
closed until the power is connected.
Setting Up 120/220 Volt Units for 220-240 Volt Operation
WARNING: Do not connect the power cord to the
power supply until instructed to do so.
4
Remove the front panel.
5
Loosen the strain relief on the back of the brewer.
6
Disconnect the existing power cable from the terminal
block and remove.
7
Feed the 220-240 Volt power cable through the strain
relief, into the brewer. The brewer may be wired for
connection directly to a junction box or for use with a
power plug that connects to an electrical outlet meeting
the brewer SPECIFICATIONS.
8
Disconnect and cap the jumper wire between the "C"
and "N" terminals on the terminal block.
9
Connect the wires on the power cable to the terminal
block inside the brewer according to the ELECTRICAL
SCHEMATIC.
10 Tighten the strain relief and replace the front panel.
Front
panel
block
or

II9

082019C

Advertisement

Table of Contents
loading

Table of Contents