Table Of Contents - Raypak 268A Installation And Operation Manual

Gas-fired pool and spa heater
Table of Contents

Advertisement

RELEASED
1. WARNINGS ............................................................. 4
Pay Attention to These Terms ................................. 4
2. WATER CHEMISTRY ............................................. 5
3. BEFORE INSTALLATION ...................................... 6
Receiving equipment............................................... 6
Rating and certifications .......................................... 6
Elevation ................................................................. 6
Ambient Temperature Rating .................................. 6
4. INSTALLATION ....................................................... 7
Installation Codes.................................................... 7
Clearances .............................................................. 7
Outdoor Heater Installation ..................................... 8
Combustion and Ventilation Air ............................. 11
Vent Piping ............................................................ 13
D-2 Power Vent Kit ................................................ 13
Gas Supply Connections....................................... 14
Flow Rate .............................................................. 15
ProTek Shield Assembly........................................ 16
Unitherm Governor Operation ............................... 17
Internal Automatic Bypass Valve ........................... 17
External Auxiliary Bypass Valve ............................ 17
Auxiliary Bypass Valve Adjustment ....................... 17
Pressure Relief Valve Installation .......................... 18
Heat Exchanger Reversal ..................................... 18
Plumbing Diagrams ............................................... 19
NOTE: Protek Shield Adapter and assembly shown in Figures, but not available until end of Q3 2020.
CONTENTS
5. ELECTRICAL WIRING ......................................... 20
Electrical Power Draw ........................................... 20
Transformer Wiring ............................................... 21
6. WIRING DIAGRAM ............................................... 22
7. CONTROLS ........................................................... 23
Control Panel Removal ......................................... 23
Control Adjustments .............................................. 23
Operation .............................................................. 24
Status and Diagnostics ......................................... 26
Remote Control Wiring .......................................... 27
8. OPERATING INSTRUCTIONS ............................ 32
Before Start-Up ..................................................... 32
Start-Up Procedures ............................................. 32
Visual inspection ................................................... 32
Water Flow Switch ................................................ 32
9. MAINTENANCE AND CARE ............................... 34
Cold Weather Operation ....................................... 34
10. TROUBLESHOOTING ......................................... 35
Flow Chart ............................................................. 36
Control Logic - Flow Chart ................................... 37
11. REPLACEMENT PARTS ..................................... 38
12. ILLUSTRATED PARTS LIST .............................. 39
3
For Reference Only

Advertisement

Table of Contents
loading

This manual is also suitable for:

408a

Table of Contents