Siemens SIMOTICS TN Series Operating & Installation Instructions Manual page 7

Low-voltage motor n-compact
Table of Contents

Advertisement

6.3.6
Connection without terminal box............................................................................................70
6.3.7
Connecting the machine for a specific direction of rotation....................................................71
6.4
Introducing and routing the cables.........................................................................................71
6.4.1
Inserting the cable into the 1XB16... terminal box with cable gland ......................................71
6.4.2
Inserting the cable into the 1XB.. terminal box with ring seal.................................................72
6.4.3
Laying cables.........................................................................................................................74
6.4.4
Connecting cables with cable lugs.........................................................................................74
6.4.5
Connection without cable lugs...............................................................................................75
6.4.6
Use of aluminum conductors..................................................................................................76
6.4.7
Using single-stranded cables.................................................................................................77
6.4.8
Internal equipotential bonding................................................................................................77
6.4.9
6.4.10
Minimum air clearances.........................................................................................................78
6.4.11
Finishing connection work......................................................................................................78
6.5
Connecting the auxiliary circuits.............................................................................................79
6.5.1
Selecting cables.....................................................................................................................79
6.5.2
Bringing cables into the auxiliary terminal box and routing them...........................................79
6.5.3
Connecting temperature monitoring for the stator winding....................................................80
6.5.4
Terminating the connection work (auxiliary circuit)................................................................80
7
Start-up.......................................................................................................................................................81
7.1
Checks to be carried out prior to commissioning ..................................................................81
7.2
Converter operation...............................................................................................................82
7.2.1
Operation on a converter with a low pulse frequency............................................................83
7.3
Measuring the insulation resistance before commissioning...................................................84
7.4
Greasing the roller bearings prior to commissioning..............................................................84
7.5
Setpoint values for monitoring the bearing temperature........................................................85
7.6
Set values for monitoring the winding temperature................................................................86
7.7
Test run..................................................................................................................................86
7.8
De-energizing.........................................................................................................................88
8
Operation....................................................................................................................................................89
8.1
Safety guidelines in operation................................................................................................89
8.2
Switching off the anti-condensation heating...........................................................................90
8.3
Switching on the machine......................................................................................................91
8.4
Regreasing roller bearings.....................................................................................................91
8.5
Switching on again after an emergency switching-off............................................................91
8.6
Stoppages..............................................................................................................................91
8.6.1
8.6.2
Avoidance of damage to roller bearings during stoppages....................................................92
8.6.3
Shaft grounding brushes (option)...........................................................................................93
8.6.4
8.7
Decommissioning the machine..............................................................................................94
8.8
Re-commissioning the machine.............................................................................................94
SIMOTICS TN Series N-compact 1LL8
Operating Instructions 11/2018
Table of contents
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simotics tn 1ll8

Table of Contents