Riello AARIA MONO 25 PLUS Installation And Technical Service Instructions

R32 series

Advertisement

Quick Links

AARIA MONO PLUS
SERIES R32
EN
INSTALLATION AND TECHNICAL SERVICE INSTRUCTIONS

Advertisement

Table of Contents
loading

Summary of Contents for Riello AARIA MONO 25 PLUS

  • Page 1 AARIA MONO PLUS SERIES R32 INSTALLATION AND TECHNICAL SERVICE INSTRUCTIONS...
  • Page 2 — RoHS Directive 2011/65/EU — ErP Directive 2009/125/EC and Regulation 2012/206/EC — WEEE Directive 2012/19/EU — F-Gas Regulation 2014/517/EU RANGE Model Code AARIA MONO 25 PLUS 20151556 AARIA MONO 35 PLUS 20151557 AARIA MONO 50 PLUS 20151558 ACCESSORIES For the complete list of accessories and the information relating to their usage combinations, please refer to the catalogue.
  • Page 3: Table Of Contents

    AARIA MONO PLUS TAbLE OF CONTENTS GENERAL INFORMATION ....p. 4 General Notices ......p. 4 Safety precautions .
  • Page 4: General Information

    GENERAL INfORMAtION GENERAL INFORMATION This unit contains fluorinated greenhouse gases covered General Notices by the Kyoto protocol. Maintenance and disposal activities must be carried out exclusively by skilled personnel. When you get the product, check immediately that the con- This booklet is an integral part of the device, and must the- tents are all present and undamaged.
  • Page 5: Unit Description

    The R32 refrigerant allows high yields, thus placing R AARIA MONO PLUS among the most efficient devices on the mar- RIELLO Spa - Via Ing. Pilade Riello, 37045 LEGNAGO (VR) - Italy ket.
  • Page 6: Layout

    GENERAL INfORMAtION Layout MODEL 25 - 35 Upper panel 10 Liquid line connection (model 25), gas line connection Fan protection grille (model 35) Support bracket Gas line connection (model 25), liquid line connection (mo- Connections cover del 35) Handle for handling 12 Filter Heat exchanger 13 Muffler...
  • Page 7: Technical Specifications

    GENERAL INfORMAtION Technical specifications Performance combined with AMW P Model AMW 25 P AMW 35 P AMW 50 P Cooling performance [A35 / A27] Capacity at rated air flow 2,60 3,50 5,20 Absorbed power at rated air flow 0,65 0,88 1,41 kW/kW 4,00...
  • Page 8 GENERAL INfORMAtION Performance combined with AMK P Model AMK 35 P AMK 50 P Cooling performance [A35 / A27] Capacity at rated air flow 3,50 5,00 Absorbed power at rated air flow 1,09 1,56 kW/kW 3,21 Capacity at maximum air flow 3,80 5,50 Absorbed power at maximum air flow...
  • Page 9 GENERAL INfORMAtION Performance combined with AMD P Model AMD 35 PA AMD 50 PA Cooling performance [A35 / A27] Capacity at rated air flow 3,50 5,00 Absorbed power at rated air flow 1,09 1,56 kW/kW 3,21 Capacity at maximum air flow 3,80 5,50 Absorbed power at maximum air flow...
  • Page 10 GENERAL INfORMAtION Performance combined with AMS P Model AMS 35 P AMS 50 P Cooling performance [A35 / A27] Capacity at rated air flow 3,50 5,00 Absorbed power at rated air flow 0,88 1,45 kW/kW 3,81 3,48 Capacity at maximum air flow 4,30 5,70 Absorbed power at maximum air flow...
  • Page 11 GENERAL INfORMAtION Performance combined with AMC P Model AMC 25 P AMC 35 P AMC 42 P Cooling performance [A35 / A27] Capacity at rated air flow 2,50 3,40 4,20 Absorbed power at rated air flow 0,65 0,92 1,30 kW/kW 3,80 3,60 3,23...
  • Page 12 GENERAL INfORMAtION Outdoor unit Model Cooling performance [A35 / A27] Nominal capacity 2,60 3,50 5,20 Nominal power input 0,65 0,88 1,40 Rated frequency Maximum frequency Minimum frequency Nominal current consumption 2,90 3,90 6,20 Max. current input 6,70 8,90 Minimum current consumption 0,90 1,40 1,80...
  • Page 13: Operating Limits

    GENERAL INfORMAtION Operating limits Operating mode temperature Indoor air (W.b.) °C Cooling Outdoor air (D.b.) °C Indoor air (D.b.) °C Heating Outdoor air (W.b.) °C The values are based on the following condition: — pipe length: 5 m — air flow: maximum —...
  • Page 14: Installation

    The Instruction book comes with the equipment and it should be taken, read and kept carefully. The document envelope must be kept in a safe place. Any duplicate must be requested from Riello S.p.A. which reser- ves to charge the cost. Model...
  • Page 15: Storage

    INStALLAtION Handles Strapping bands Model Document envelope and material supplied as kit Product dimensions Follow the below instructions for packing removal and product handling: — transport the equipment in the installation place — cut strapping bands Weight 29,0 31,5 37,8 —...
  • Page 16: Place Of Installation

    INStALLAtION Do not tilt the equipment over 15° The unit’s weight is concentrated on the compressors side (connection covering side). The packing material must not be disposed of in the sur- rounding environment and must be kept out of children reach, as it can be dangerous.
  • Page 17: Installation On Old Systems Or Systems In Need Of

    INStALLAtION Positioning on floor Model Refrigeration characteristics Condensate discharge attachment Ø Hanging position Properly sized supporting brackets must be used if the devi- ce is installed in suspension. Ensure that the wall section does not include bearing ele- ments, pipes or electric lines. Fastening screw M4 Anti-vibration element (supplied) Spirit level...
  • Page 18 INStALLAtION Pipe Ø thickness inches 6,35 9,52 12,70 15,88 Maximum operating pressure 4.3 Mpa. In case of a drop in excess of 5 m, a siphon must be installed every 5-7 metres. The given measures are the maximum permitted values. Cooling connections featuring shut-off valves are preconfi- gured for flare connections.
  • Page 19 INStALLAtION — cut the pipe end square using a pipe cutter Pipe Ø — remove burrs keeping the cut edge facing down inches — remove the flare nut on the unit connection 6,35 — insert it into the connection pipe 9,52 —...
  • Page 20 INStALLAtION Gas pipe Opening Condensation discharge Closing Liquid pipe Service connection blanking plug Heat insulation On-off valve shaft Adhesive tape Refrigerating pipe attachment On-off valve cover plug Hex wrench — insulate the liquid and gas pipes separately — use insulating material that is thicker than 15 mm If required: —...
  • Page 21 INStALLAtION Pneumatic vacuum to create vacuum in the circuit: — keep the outdoor unit shut-off valves closed High pressure Low pressure Pressure regulator Nitrogen cylinder Pressure gauge unit 3-way valve service connection High pressure Low pressure Pressure gauge unit Vacuum pump 3-way valve service connection —...
  • Page 22 INStALLAtION — fix the leak — recreate the pneumatic vacuum Take the necessary safety precautions for the system refri- gerant. It is forbidden to carry out welding operations with refrige- rant inside the cooling circuit. If necessary, the refrigerant must be recovered and the circuit must be cleaned with ni- trogen without oxygen.
  • Page 23: 2.11 Wiring Diagram

    INStALLAtION 2.11 Wiring diagram MODEL 25 - 35 PFC REACTOR COMPRESSOR REATTORE PFC COMPRESSORE CN1 ( BL ) AC-N CN2 ( BR ) AC-L SCHEDA ELETTRONICA CN4 ( R ) PRINCIPALE CN4 '( U ) MAIN PCB BOARD CN3 '( V ) CN2 '( W ) CN20 CN18...
  • Page 24: 2.12 Electrical Connection

    INStALLAtION 2.12 Electrical connection AARIA MONO PLUS It leaves the factory completely wired, and only requires a connection to the electrical power grid, the installa- tion of a padlockable disconnecting switch, and a connection to the indoor unit. The unit must be powered with a separate electric circuit. Terminal blocks Terminal board cover panel Connections cover...
  • Page 25 INStALLAtION MODEL 50 MODEL 50 1 (N) 2 (L) 1 (N) 2 (L) 3 (C) 230V 1-N 50HZ Connection terminal board with indoor unit Power supply connection terminal board Wire retainer Earth screw 3(C) 2(L) 1(N) — remove the wire retainer —...
  • Page 26 INStALLAtION The cable sections specified in the table are minimum re- Avoid using mobile phones. quirements. The correct size must be calculated taking in- to account the actual length, the type of routing and other It is forbidden to earth the device together with pipes, li- conditions set by the existing regulations.
  • Page 27: Commissioning And Maintenance

    COMMISSIONING AND MAINtENANCE COMMISSIONING AND MAINtENANCE Avoid using mobile phones. Preparation for first commissioning Additional refrigerant charge Prior to commissioning, it is necessary to check that: — all the safety conditions have been met The units are supplied with a sufficient amount of refrigerant gas —...
  • Page 28: Ordinary Maintenance

    COMMISSIONING AND MAINtENANCE — cold device Any gas leaks indoors can generate toxic gases if they come into contact with naked flames or high temperature bodies, — device NOT supplied with electric power in case of leaks, please air the rooms thoroughly. —...
  • Page 29: Operation Signal And Alarms

    COMMISSIONING AND MAINtENANCE — connect the charging tube of the pressure gauge unit to Led 2 Description the three-way valve service connection on gas side Indicates that the unit is supplied with — vent the air from the charging tube electricity —...
  • Page 30 COMMISSIONING AND MAINtENANCE Led 1 Description Remarks The alarm activates 5 minutes after the unit start The alarm activates when, in 4-way valve Heating mode, the temperature malfunction detected by the indoor unit heat exchanger probe is less than or equal to 15°C for 1 minute and for 3 times in an hour Deviate from the...
  • Page 31: Disposal

    RECYCLING AND DISPOSAL DISPOSAL Packaging materials shall be disposed of separately so as to re- cover and recycle them. Refrigerant and oil must be recovered and not dispersed into the environment. At the end of its service life, the device shall be disposed of according to the existing le- gislation.
  • Page 32 RIELLO S.p.A. - 37045 Legnago (VR) tel. +39 0442 630111 - fax +39 0442 630371 www.riello.it As the manufacturer is constantly improving its products, the aesthetic or dimensional features, the technical data, the equipment and accessories indicated could be subject to variations.