Ii27 - Curtis WB5N Series User Manual

Hide thumbs Also See for WB5N Series:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
Installation
NOTICE: Before proceeding, make sure that the
counter is capable of supporting at least 81 lbs.
(37 kg) to allow for the water boiler at full capacity.
Leveling
WARNING: Use the leveling legs to level the unit
only. Do not use them to adjust the height. Do not
extend them higher than necessary.
1
Position the water boiler on the counter top. Level it
left to right and front to back by turning the bottom of
the legs.
Connect the Water Supply
2
Flush the water supply line prior to installation to purge
3
back of the unit. Leave the water supply valve closed
until the power is connected.
Connecting the Power Cord (units without power cord
installed or units being converted from 120 Volt to
200 - 240 Volt operation)
4
Remove the top cover from the unit.
5
Loosen the strain relief on the back of the unit.
6
On units equipped with an existing 120 Volt power
cord, disconnect the cord from the power block and
remove it. Locate the white jumper wire between the
"L2" and "N" terminals on the power block. Disconnect
and cap one end of the wire.
7
Feed the 220-240 Volt power cable into the unit. The
water boiler may be wired for connection directly to
a junction box or (if local ordinances permit) for use
with a power plug that connects to an electrical outlet
meeting the boiler SPECIFICATIONS. Connect the
wires on the power cable to the terminal block inside
the unit.
8
Tighten the strain relief and replace the top cover.

II27

Style
varies
Style
varies
Style
varies
Power
block
080819B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wb5nWb5n63Wb5nlWb5nbWb5nlbWb5n30 ... Show all

Table of Contents