INSTALLATION INSTRUCTIONS
Installation
NOTICE: Before proceeding, make sure that the
counter is capable of supporting at least 81 lbs.
(37 kg) to allow for the water boiler at full capacity.
Leveling
WARNING: Use the leveling legs to level the unit
only. Do not use them to adjust the height. Do not
extend them higher than necessary.
1
Position the water boiler on the counter top. Level it
left to right and front to back by turning the bottom of
the legs.
Connect the Water Supply
2
Flush the water supply line prior to installation to purge
3
back of the unit. Leave the water supply valve closed
until the power is connected.
Connecting the Power Cord (units without power cord
installed or units being converted from 120 Volt to 200
- 240 Volt operation)
WARNING: Turn off power to the junction box at
the circuit breaker panel before connecting the
power cable. Lock out and tag the circuit breaker.
4
Remove the top cover from the unit.
5
Loosen the strain relief on the back of the unit.
6
On units equipped with an existing 120 Volt power
cord, disconnect the cord from the power block and
remove it. Locate the white jumper wire between the
"L2" and "N" terminals on the power block. Disconnect
and cap one end of the wire.
7
Feed the end of the power cable, through the strain
relief and into the unit and connect it to the power
block according to the ELECTRICAL SCHEMATIC.
8
Replace the top cover.
9
If applicable, connect the power cable wires to the
terminals in the junction box. See the ELECTRICAL
SCHEMATIC for the power supply requirements.

II27

Style
varies
Style
varies
Style
varies
Power
block
010518NC

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wb5nlWb5nlbWb5nbWb5n30

Table of Contents