Drawings & Flow Charts - Daikin VAM 150FJVE Service Manual

Heat recovery ventilation
Table of Contents

Advertisement

SiE00-01
Drawings & Flow Charts
A
Air Conditioner Link Operation
1 group link control ..........................................25
Link control of 2 or more groups ......................26
Air flow rate can be changed over .........................11
C
Centralized control group No. setting .............. 55
Check 1 ..................................................................49
Check 2 ..................................................................49
Check 3 ..................................................................49
Check damper motor .............................................52
Check microcomputer operation monitor. ..............47
Check resistance and voltage with tester ..............51
Circuit Configuration ..............................................30
Cold Area Mode .....................................................25
Connect remote controller cable
and remote controller. .....................................42
D
Dedicated Remote Controller .................................41
Display OFF in automatic ventilation mode ...........60
dry Air filter .............................................................17
E
Error Code 60 ................................................. 35
Error Code 64 ........................................................37
Error Code 65 ........................................................38
Error Code 6A ................................................. 39
Error Code Indication .............................................34
Error Code U5 ................................................. 42
Error Code U8 ........................................................44
Error Code UA .......................................................45
Error Code UC .......................................................46
Explanation of Individual Functions
Direct duct connection with air conditioner ......23
Normal operation .............................................23
F
Field Setting ...........................................................59
Function of main connection terminal ....................28
G
General Constructions
VAM1000FJVE ..................................................2
VAM1500FJVE ..................................................3
VAM150FJVE ....................................................2
VAM2000FJVE ..................................................3
VAM250FJVE ....................................................2
VAM350FJVE ....................................................2
VAM500FJVE ....................................................2
VAM650FJVE ....................................................2
VAM800FJVE ....................................................2
Drawings & Flow Charts
H
HOW TO OPERATE WITH TIMER ....................... 12
I
Initial setting (mode Nos. 17, 27, 18, 28) .............. 54
Inspection operation .............................................. 61
L
,
62
LCD and Operation Panel ..................................... 60
M
Main Unit PCB ....................................................... 41
Main unit PCB ....................................................... 47
Maintenance Cover
VAM150~1000FJVE ....................................... 16
VAM1500~2000FJVE ..................................... 16
Maintenance for The Heat Exchange Element ..... 19
N
Normal ventilation mode ....................................... 60
O
Operation Changeover Control ............................. 58
Operation for Each System ................................... 10
operation mode selector ........................................ 13
,
36
P
Power Transformer ............................................... 51
,
40
Pre-cool/pre-heat operations ................................. 24
Printed Circuit Board ............................................. 28
,
43
Procedure for entering individual settings
(mode No.: 44) ............................................... 62
R
Remote Controller for HRV BRC301B61 .............. 11
Remote Controller for VRV BRC1A61·62 ............. 13
Remove thermistor and check resistance
with tester. ...................................................... 50
T
Take out the heat exchange elements
VAM150~1000FJVE ....................................... 17
VAM1500~2000FJVE ..................................... 17
Thermistor temperature - resistance
conversion table ............................................. 50
To clean the air filter .............................................. 17
Total heat exchange ventilation mode .................. 60
Turn on the forced fan (Mode No.43) .................... 56
U
Unit No. reallocation (Mode No.45) ....................... 57
Use tester to check resistance ........................ 37
V
VAM2000EJVE ..................................................... 67
,
38
v

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents