13
Use tall panels to create the second lay-
er, following the configuration you have
chosen. Add connector rings as you go
so each panel is captured by four rings
and will not fall down. You may want to
stand on the platform to do this.
15
Screw a cap onto each post to lock
construction together. You will hear
a clicking sound as you turn the cap;
screw it all the way down.
Model 1 Starter
14
Check all joints. Make sure all panels
are where you want them to be. Then
fill the hole with the circular plug.
Step on the plug to lock it in place.
16
Check that all post feet are firmly on
the floor. If a post needs lengthening,
turn the rubber foot clockwise until the
post is anchored.
9
Need help?
Do you have a question about the Community Loft 1 Starter and is the answer not in the manual?