Installation; Use Environment - Carrier 16LJ-01 Installation Manual

Absorption chiller
Hide thumbs Also See for 16LJ-01:
Table of Contents

Advertisement

1. INSTALLATION

1-1. USE ENVIRONMENT

1-1-1. Machine room
Absorption Chiller is indoor use ONLY.
IP number of Absorption Chiller is IP40.
Please keep the machine room temperature between 5℃ and 40℃ for protection of the solution
crystallization during chiller shut down. Please keep the humidity in the machine room within 90%.
a) When performing crane work, please avoid bad weather such as strong wind.
b) Please establish so that a crane may become stable in the ground.
c) Please refer to lifting data of Contract specifications for lifting method of the chiller/heater.
d) Please select a hanging wire with the enough strength by marking reference to weight data
of Contract specifications.
e) The wire to use please carry out prior visual inspection and periodical inspection.
1-1-2. Field wiring
For CE, please connect to power source by overvoltage category Ⅲ, and to other wiring by
overvoltage category Ⅱ.
1-1-3. Altitude
Please install Absorption Chiller at a height of less than 1000m above sea level.
If the location is higher than 1000m above sea level, please contact Carrier agent.
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

16lj-0216lj-03

Table of Contents