Advertisement

Quick Links

CCEI S.A.
Ed. 1999
T
M
ECHNICAL
ANUAL
V2-0
LIMPIDO
-Pro
®
160

Advertisement

Table of Contents
loading

Summary of Contents for ccei LIMPIDO-Pro

  • Page 1 CCEI S.A. Ed. 1999 ECHNICAL ANUAL V2-0 LIMPIDO -Pro ®...
  • Page 2: Table Of Contents

    Installing the flow detector ...........................9 ® Installing the Pool Terre ...........................10 Electrical connection ...........................11 STARTUP........................11 Check on the salt content ..........................11 Adjusting the production level ........................12 Checking the pH ............................13 MAINTENANCE ......................14 Wintering ...............................14 Adding salt ..............................14 PERSONAL NOTES .....................15 CCEI page 2...
  • Page 3: Characteristics

    (Normal and Inverse) that alternate the polarity of the electrodes. This polarity inversion avoids scaling of the electrodes. The duration of each production cycle is about 2h00 and it is broken down as follows: CCEI page 3...
  • Page 4 Programmed mode (Operation on the clock): In this mode, the LIMPIDO only operates during the times programmed on its clock. Its operating times within the periods determined for the filtration pump should be defined (see example below). CCEI page 4...
  • Page 5: The Electrolytic Cell

    It is specially designed to maximize life and to restrict maintenance operations. The Flowmeter The flowmeter delivered with LIMPIDO 100 prevents the electrolyser from functioning when water is not circulating and during back-washing. This prevents any build up of hydrogen or overheating, ensuring the unit remains safe. CCEI page 5...
  • Page 6: The Control Box

    Front Panel Power on light Programming clock Operation selector (Auto/Off/Manual) Water circulation light Production light (normal or inverse) Production indicator ammeter Production adjustment Cell protection circuit breaker CCEI page 6...
  • Page 7: The Production Indicator

    25°C. It is recommended that the salt content should be kept between 2.5g/l and 4.5g/l to protect the electrolysis cell. The water conductivity varies with the temperature. The salt content should be kept above 3.5 g if LIMPIDO is to operate in water below 18°C. CCEI page 7...
  • Page 8: Installation

    Install the cell and the flow detector according to one of the following layouts: Cell Flow detector Side view Flow detector Discharge Cell Bottom view Intake In line installation The bypass installation is necessary when the inline flow exceeds 22m 3 /h.(see below). CCEI page 8...
  • Page 9: Installing The Flow Detector

    Wait until it is completely dry, and then screw in the detector, fitting the supplied 20/27 seal onto it. Do not overtighten the detector. Flow detector Seal 25 / ¾" nipple To be glued 50/50/25 Tee FLOW DETECTOR ASSEMBLY CCEI page 9...
  • Page 10: Installing The Pool Terre

    • connection to the earthing rod and using a green and yellow cable with appropriate cross-section (not less than 16mm²). ® POOL TERRE Discharge Earthing cable minimum 16mm² Earth CCEI page 10...
  • Page 11: Electrical Connection

    1 mg/l to 9,990 mg/l . Since the display only shows 3 figures, the tester displays an symbol immediately after the value read when this value exceeds 999 mg/l. Thus 450 means 4,500 mg/l or 4.5g/l. CCEI page 11...
  • Page 12: Adjusting The Production Level

    Similarly, an increase in the pH (lack of acid) quickly reduces the quantity of active chlorine contained in the water. Thus, the percentage of active chlorine is divided by 4 when the pH increases from 7.2 to 8.2. CCEI page 12...
  • Page 13: Checking The Ph

    For example, the daily operating time of the LIMPIDO for a 120m pool with a pH equal to 7.2, is approximately 7h30 at 25°C and 7h30 x 1.5, or 11h15’, when the water temperature is between 27°C and 29°C. CCEI page 13...
  • Page 14: Maintenance

    The following salt quantities should be added, as a function of the measured salt content: Pool volume in m 3 Measured content 2.5g/l 3g/l 3.5g/l Weight of salt to be added to reach 4g/l, in kg CCEI page 14...
  • Page 15: Personal Notes

    LIMPIDO-P OTICE ECHNIQUE ERSONAL OTES CCEI page 15...
  • Page 16 LIMPIDO-Pro 160 Date of sale: ..................Series No.: ....................Declaration The CCEI SA company (FR 1507 073 804 973) declares that the LIMPIDO product satisfies the safety and electromagnetic compatibility requirements specified in European directives 73/23/CEE and 89/336/CEE. Emmanuel Baret...

This manual is also suitable for:

160

Table of Contents