Crown GMTS-30 Installation & Operation Manual page 17

Gas modular skillets
Hide thumbs Also See for GMTS-30:
Table of Contents

Advertisement

INSTALLATION AND OPERATION MANUAL, GAS SKILLETS, MODELS GMTS-(30, 40, 60)
ADJUSTMENTS AND CONTROLS (Continued)
FLOW CONTROL:
There are two flow control valves mounted on the power unit and located on the solenoid valve
subplate. The flow control valves will restrict the capacity of oil passing through them when the
knurled knob is screwed in - in a clockwise direction. This action will reduce the linear speed of
the cylinder. Turning the flow control valve adjustment in the opposite direction - anti clockwise,
will increase the speed of the cylinder. One flow control valve (right side) will allow adjustment
of the extension speed (travel speed should be set at minimum 20 seconds), the other (left
side) the retraction speed. (Retraction speed should be set at minimum 10 seconds).
IMPORTANT:
It should be noted that if the cylinder speed is restricted by the flow control valves, the balance
of oil not delivered to the cylinder will go over the relief @ 825 P.S.I. which will cause unwanted
heat in the reservoir.
Part No. 10094R2
17
2019-01-16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gmts-40Gmts-60

Table of Contents