This procedure describes connecting cables and use of the two hook and loop straps
provided in the rail kit to route the cables at the back of the server.
Procedure
1. Connect I/O and power cables as described in your system cabling
documentation.
2. Locate the outer CMA brackets on the interior sides of both cabinet flanges (1).
3. Bundle the cables gently, pulling them clear of the server connectors to the left
and right sides (2).
4. Thread the hook and loop straps through the tooled slots on the outer CMA
brackets on each side of the server to secure the cable bundles (3).
Figure 31 Hook and loop straps
Bezels are application specific, and may not appear as shown. This procedure can be
used to install all bezels.
Procedure
1. Position right side of bezel on the server bracket. Rotate the bezel inward so
that it is flush with front of the server and the latch on the left side secures the
bezel.
2. Lock the bezel with the provided key and store the key in a secure place.