Routing Cables - Dell PowerEdge R805 Installation Manual

Rack installation guide
Hide thumbs Also See for PowerEdge R805:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Routing Cables

1 Open the wire cable basket on the top of the cable-management arm,
to enable cables to be routed within the arms (see Figure 1-9).
Figure 1-9. Routing Cables on the Cable-Management Arm
1
tie wraps (2)
3
cable-management arm
2 If applicable, connect the system status-indicator cable to its connector
on the system back panel.
Route the system status-indicator cable through the cable-management
arm, and press the LED end into the slot on the end of the cable-
management arm until it snaps into place.
3 Attach the I/O cable connectors and power cable connectors to their
respective connectors on the system back panel.
For details on cable connections, see your system's Getting Started Guide
or Hardware Owner's Manual.
NOTE:
strain relief for the power cables.
4 Route the cables along the bend in the cable-management arm.
5 Adjust the cable slack as needed at the hinge position and secure
the cables with the tie wraps (see Figure 1-9).
Use the retainer brackets on the back of the power supplies to provide
4
3
2
system status-indicator cable connector
4
wire cable basket
Rack Installation Guide
1
2
21

Advertisement

Table of Contents
loading

Table of Contents