Wiring Diagrams for a 2U1N Configuration
Management network wiring for 2U1N configuration
Hardware Installation Guide
76
Table 17 Single-phase power distribution cabling (continued)
Source
Node 1 PSU1
Node 1 PSU2
Use the following figure and table to connect the management network cables.
Note
The page does not provide enough space to illustrate cabling of the maximum number
of nodes in the management network. However, the table does provide all the source
to destination cabling for the maximum sized network.
Figure 35 Management network
Destination
PDU 3 Port 14
PDU 4 Port 14