Prior To Operation; Continuous Drainage - eeese Adam User Manual

Hide thumbs Also See for Adam:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 71
3.

Prior to Operation

• Place the dehumidifier in an upright position on a stable, flat surface.
• Ensure the dehumidifier is at a safe distance at least 50 cm away from a wall or furni-
ture.
• Supply power should be in correspondence with the value on the nameplate, power
outlet needs to be grounded.
• Ensure the tank is correctly fitted, if the tank is full or not in place, the tank full light
comes on and the dehumidifier will stop working.
• Turn on the power and run the machine as per instructions below.
4.

Continuous Drainage

In general, water will be collected by tank, if you want continuous drainage, please do
steps as follows:
a. Remove the water tank.
b. Mount a drainage hose (14mm inner diameter) to the drainage outlet.
c. Put the water tank back in place.
Please always make sure the hose is going downhill, and is not blocked or kinked.
MV-2509-8-2020 . eeese-aircare.com © All rights reserved eeese air care aps
UK
75

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Adam and is the answer not in the manual?

This manual is also suitable for:

2509

Table of Contents

Save PDF