Mitsubishi Electric MXZ-2HA40VF-E1 Service Manual page 72

Outdoor unit
Hide thumbs Also See for MXZ-2HA40VF-E1:
Table of Contents

Advertisement

OPERATING PROCEDURE
5. Removing the expansion valve
(1) Remove the service panel (Photo 1).
(2) Remove the top panel, the cabinet, and the back
panel (Photo 1, 2, 3).
(Gas recovery is not required if the unit is pumped
down.)
(3) Remove the electrical parts for removing LEV R (Photo 4,
8).
(4) Remove the LEV coils.
(5) Detach the brazed parts of expansion valves and
pipes.
© Copyright 2018 MITSUBISHI ELECTRIC CORPORATION
Issued: Mar. 2021. No.OBH828 REVISED EDITION-B
Issued: Feb. 2021. No.OBH828 REVISED EDITION-A
Published: Dec. 2018. No.OBH828
Made in Japan
HEAD OFFICE: TOKYO BUILDING, 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN
Photo 11
R.V. coil
Photo 12
Outdoor heat
exchanger
temperature
thermistor (RT68)
LEV coils
Specifications are subject to change without notice.
72
PHOTOS
4-way valve
Brazed parts
Ambient
temperature
thermistor
(RT65)
Defrost thermistor (RT61)
Expansion
valves

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents