Installation

Levelling the tumble dryer

Ensure that no closeable door, slid-
ing door or oppositely hinged door is
installed that could hinder opening of
the tumble dryer door in any way.
To ensure proper operation, the tumble
dryer must stand perfectly level. The
screw feet on the tumble dryer can be
adjusted to compensate for unevenness
in the floor.
 Turn the screw feet by hand or with a
flat open spanner.

Downtime after installation

Damage to the tumble dryer by
switching it on too soon.
This can damage the heat pump.
After setting up the tumble dryer wait
for at least one hour before switching
it on.

Ventilation

The cool air intake at the front of the
tumble dryer must not be blocked or
covered. This would hinder a suffi-
cient intake of cool air for the heat
exchanger.
Do not block the gap between the
bottom of the tumble dryer and the
floor with plinth facings, deep pile
carpet etc. This would hinder a suffi-
cient flow of air to the tumble dryer.
The hot air that is blown out from the
heat exchanger warms the room air. En-
sure sufficient ventilation of the room:
e.g., open the window. The drying time
will otherwise take longer (higher energy
requirement).
Before moving the tumble dryer
again (e.g. when moving house)
After each use a small quantity of con-
densed water will collect in the area of
the pump. This water can run out if the
tumble dryer is tipped up when it is be-
ing moved. Recommendation: run the
Warm air programme for approximately
1 minute before moving the tumble
dryer. Any remaining condensed water
will then be fed into the condensed wa-
ter container or out through the drain
hose.
Installation
81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco&steam&9kg twr780wp

Table of Contents