Full E-1 Configuration Using Ppp - Enterasys WPIM-E1 Network Manual

Enterasys wpim-e1 interface module: network guide
Table of Contents

Advertisement

CHAPTER 2: LOCAL MANAGEMENT

2.3 FULL E-1 CONFIGURATION USING PPP

This section provides step-by-step instructions for configuring the
WPIM-E1 to use a full E-1 circuit in a PPP environment. This simplified
example assumes the setup shown in figure 2-5 using a MicroMMAC hub
with a BRIM-W6 containing a WPIM-E1 at Site #1. Configurations may
vary depending on the hub.
SITE 1
32 Timeslots
(31 customer-usable)
The line configuration information shown in Table 2-1 must be supplied
by the service provider.
Table 2-1. Telco Configuration Information
Configuration Information
Required By User
Line Coding
Frame Type
Clock Source
2-10
Telco Cloud
Figure 2-5. Full E-1 Configuration
WPIM-E1 LOCAL MANAGEMENT GUIDE
Configuration Information
Supplied By Service Provider
HDB3 or AMI
E1 or E1-CRC
Loop Timing or Local Timing
SITE 2
32 Timeslots
(31 customer-usable)
1484_05

Advertisement

Table of Contents
loading

Table of Contents