Download Print this page

Enterasys Matrix-V V2H124-24FX Quick Reference Manual

Fast ethernet switch
Hide thumbs Also See for Matrix-V V2H124-24FX:

Advertisement

Important Notice
The stacking module must only be installed in slot 25.
Installing an Optional Module into the Switch
Caution: DO NOT install slide-in modules with the switch powered on. Be sure you
power off the switch before installing any module.
Note: The stacking module must only be installed in slot 25.
To install an optional module into the switch, do the following:
1. Disconnect power to the switch.
2. Remove the blank metal plate (or a previously installed module) from
the appropriate port by removing the two screws with a flat-head
screwdriver.
3. With the module still in the anti-static bag, touch the metal frame of the
switch to prevent damage caused by static electricity discharge. Also, it
is recommended to use an ESD wrist strap during installation.
4. Remove the module from the anti-static shielded bag.
5. Holding the module level, guide it into the carrier rails on each side and
gently push it all the way into the port, ensuring that it firmly engages
with the connector.
Mounting
This switch can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
Installing Optional Modules: Before mounting the switch, you may want
to install optional modules. If you have purchased optional slide-in
100BASE-FX, 1000BASE-T, 1000BASE-T/SFP, or stacking modules, install
these modules now, following the instructions "Installing an Optional
Module" above.
Rack Mounting
Before rack mounting the switch, pay particular attention to the following
factors:
• Temperature: Since the temperature within a rack assembly may be
higher than the ambient room temperature, check that the rack-
environment temperature is within the specified operating temperature
range: 0°C to 50°C (32°F to 122°F).
• Mechanical Loading: Do not place any equipment on top of a rack-
mounted unit.
• Circuit Overloading: Be sure that the supply circuit to the rack
assembly is not overloaded.
• Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than
direct connections to the mains.
To rack-mount devices:
1. Attach the brackets to the device using the screws provided in the
Bracket Mounting Kit.
25
26
Lin k/A
ct
PW R
Po E
Dia g
25
V 2 H
1 2 4
26
Sta cki
ng
-2 4
P
Mo de
Po E/L
ink
2. Mount the device in the rack, using four rack-mounting screws (not
provided).
25
26
Link
/Act
PWR
V2 H
PoE
Diag
12 4-
24 P
25
26
Stac
king
Mod
PoE
e
/Link
3. If installing a single switch only, refer to "Connecting to a Power
Source."
4. If installing multiple switches, mount them in the rack, one below the
other, in any order.
Desktop or Shelf Mounting
1. Attach the four adhesive feet to the bottom of the first switch.
2. Set the device on a flat surface near an AC power source, making sure
there are at least two inches of space on all sides for proper air flow.
3. If installing a single switch only, refer to "Connecting to a Power
Source."
4. If installing multiple switches, attach four adhesive feet to each one.
Place each device squarely on top of the one below, in any order.
Installing an SFP Transceiver
To install an SFP transceiver, perform the following steps:
1. Consider your network and cabling requirements to select an
appropriate SFP transceiver type.
2. Insert the transceiver with the optical connector facing outward and the
port connector facing down. Note that SFP transceivers are keyed so
they can only be installed in one orientation.
3. Slide the SFP transceiver into the port until it clicks into place.
Note: SFP transceivers are hot-swappable. The switch does not need to be powered
off before installing or removing a transceiver. However, always first disconnect the
network cable before removing a transceiver.
Connecting Switches in a Stack
An optional stacking module ships with one stacking cable. The following
figure shows how the stack cables are connected between switches in a
stack.
Note: The stacking module must only be installed in port 25.
To connect up to eight switches in a stack, perform the following steps:
1. Plug one end of a stack cable into the TX (right) port of the top unit.
2. Plug the other end of the stack cable into the RX (left) port of the next
unit.
3. Repeat steps 1 and 2 for each unit in the stack. Form a simple chain
starting at the TX port on the top unit and ending at the RX port on the
bottom unit (stacking up to 8 units).
4. Complete the stack connections by plugging one end of a stack cable
into the TX port on the bottom unit and the other end into the RX port
on the top unit.
5. Select the Master unit in the stack by pressing the push button in on
only one of the stacking modules. Only one switch in the stack can
operate as the Master, all other units operate in slave mode. If more
than one switch in the stack is selected as Master, or if no switches are
selected, the stack will not function.
Note: The stacking feature requires that all stacking module ports be connected and
the switches powered on. If one stack link is not connected, or if a switch is powered
off, the stack will not function.
Connecting to a Power Source
To connect a switch to a power source:
1. Insert the power cable plug directly into the AC receptacle located at
the back of the switch.
2. Plug the other end of the cable into a grounded, 3-pin socket, AC power
source.
Note: For International use, you may need to change the AC line cord. You must use
a line cord set that has been approved for the receptacle type in your country.
3. Check the front-panel LEDs as the device is powered on to be sure the
PWR LED is lit. If not, check that the power cable is correctly plugged
in.
4. If you have purchased a Redundant Power Unit, connect it to the switch
and to an AC power source now, following the instructions included
with the package.
Multimode Fiber Cabling
To connect to an MT-RJ port, first squeeze down on the port's protective
cap and pull it out horizontally. Insert the multimode MT-RJ connector
into the port until it clicks into place.
Port and System Status LEDs
The V2H124-24FX base unit also includes a display panel for key system
and port indications that simplify installation and network
troubleshooting. The LEDs, which are located on the front panel for easy
viewing, are shown below and described in the following tables.
Table 1 Port Status LEDs
Table 2 Module LEDs
Table 3 System Status LEDs

Advertisement

loading

Summary of Contents for Enterasys Matrix-V V2H124-24FX

  • Page 1 Note: The stacking feature requires that all stacking module ports be connected and the switches powered on. If one stack link is not connected, or if a switch is powered off, the stack will not function.
  • Page 2: Quick Reference Guide

    HO3VVF3GO.75 (minimum). IEC-320 receptacle. de connexion de mise à la terre (mise à la masse). For additional support related to the product or this document, contact Enterasys Networks using les normes internationales de sécurité. one of the following methods: configuration qui permet un branchement sur une entrée d’appareil EN 60320/IEC 320.