Installation Sequence - Viessmann NC-Box Installation And Service Instructions For Contractors

Pre-assembled unit for implementing the natural cooling function in conjunction with brine/water heat pumps up to 17 kw
Table of Contents

Advertisement

Fitting the NC-Box
Installation without hydraulic connection set:
Fit the NC-Box near the heat pump on a wall capable
of bearing the load.
Installation with hydraulic connection set:
Fit the NC-Box above the heat pump with the clear-
ances shown in Fig. 2.
Fig.2
2.
1.
2.

Installation sequence

1 6
0
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents