Connection With Hydraulic Connection Set; Installing The Contact Humidistat 24 V - Viessmann NC-Box Installation And Service Instructions For Contractors

Pre-assembled unit for implementing the natural cooling function in conjunction with brine/water heat pumps up to 17 kw
Table of Contents

Advertisement

Installation sequence
Hydraulic connection

Connection with hydraulic connection set

Fig.4

Installing the contact humidistat 24 V

The contact humidistat monitors the formation of con-
densate on the flow of the heating/cooling circuit or of
the separate cooling circuit.
Where the heating/cooling circuit extends over sev-
eral rooms with different relative humidity levels, it
may become necessary to provide several contact
humidistats.
Where several contact humidistats are used, connect
all contact humidistats electrically in series.
In the delivered condition, the contact humidistat
switches at a relative humidity of 80 %. This value
can be adjusted.
Contact humidistat installation instructions
10
(cont.)
1.
A
B
C
2.
Tightening torques for fitting the union nuts
Line
Primary circuit flow
(heat
A
pump brine inlet)
Secondary circuit flow
B
Secondary circuit return
C
Note
In the delivered condition, the contact humidistat is
located outside the NC-Box casing and is electrically
connected at the control panel. The associated con-
necting cable is routed through the cable entry in the
NC-Box.
Installation conditions: The flow and return of the heat-
ing/cooling circuit or the separate cooling circuit are
connected to the NC-Box.
Connection to
Heat
NC-Box
pump
70 Nm
70 Nm
70 Nm
50 Nm
70 Nm
50 Nm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents