AFFINITY COMBINATION INSTALLATION MANUAL
Revision Guide
Pages:
Description:
Misc.
Updated for Aluminum Coils, Wiring Schematics
26-29
Updated Wiring Schematics for Auxiliary Heat Changes, Updated ETL logo, Service
Parts List
4, 9
Updated Nomenclature Hot Water Generation Option and Updated Open Loop
Solenoid Valve Connection Option Wiring Diagrams.
All
Updated to new Revision, Reformatted Layout
All
Updated Nomenclature to Reflect new ECM Blower Motor
42
Updated Parts List
35
Updated Cooling Capacity Corrections
43
Added Revision Guide
44
Date:
By:
15 May 2017
JM
14 April 2015
MA
30 Sept 2014
MA
27 Dec 2013
DS
09 Nov 2012
DS
09 Nov 2012
DS
11 Oct 2012
DS
11 Oct 2012
DS