Riello Array AR 399 SE Installation, Operation And Service Manual page 66

Table of Contents

Advertisement

APPENDIX
APPENDIX
RECYCLING AND DISPOSAL
Vertical venting system (sealed combustion)
Vertical venting system (sealed combustion)
2
1
Flexible vent and
combustion air pipe
2
1
MULTIPLE BOILERS
When installing multiple air and vent terminations, be sure that:
− The clearance between the vent and air termination are in
accordance with the figures shown in this chapter
− All vent pipes and air inlets must terminate at the same
height
Concentric vent and combustion air vertical termination; X ≥
12" (305 mm); Y ≥ 12" (305 mm) (18" (457 mm) for Canada and/
or per CAN/CSA B149.1) above highest snow level. Maximum
24" above roof
Concentric vent and combustion air horizontal termination; X
≥ 4" (102 mm); Y ≥ 24" (610 mm); Note: the terminations must
all be level with each other and at a 12" (305 mm) min from
grade or the snow line.
X
66
66
X
Combustion
air intake
Vent

Advertisement

Table of Contents
loading

This manual is also suitable for:

Array ar 500 se2018172120181722

Table of Contents