4.6. Equipment attachment

Installation material is provided. This is found in the marked
equipment modules.
In order to connect the equipment components, the following tasks
are to be carried out:
Self-adhesive sealant is to be attached per section point to the
-
profile frames in two circular tracks on the equipment
component.
Winch the equipment components together until they are
-
positioned exactly together
Do not pull the equipment components together with the
-
attachment bolts. Deformation hazard!
The bolts can then be secured. The equipment components are
-
to be connected with the prescribed equipment corner angles.
For larger equipment depth, the modules should be connected
-
with additional centring threaded connections.
The supplied pan connector (see diagram) must be installed on
-
site with unit widths between 2000 and 3000mm.
For large pieces of equipment, the square tubing should be
-
additionally secured with connecting clamps
The section points of the outer equipment components are to
-
be subsequently sealed with the sealing compound as
provided.

4.7. Ventilator installation / removal

Dismantling tracks with individual designs can be delivered as
accessories for the installation and removal of the motor or
ventilator, respectively.
For this, the motor will be transported by means of a trolley. The
drive motor can be placed on a lift wagon, for example, in front of
the unit.