Download Print this page
modway STASIS EEI-1181 Manual

modway STASIS EEI-1181 Manual

Office desk

Advertisement

Quick Links

EEI -1181
STASIS OFFICE DESK
Thank you for purchasing the MODWAY STASIS OFFICE DESK!
Before you start, here is some helpful advice:
1.We suggest you spend a short time reading through this leaflet and then follow the simple step by step
instructions.
2.Owing to the size and weight of the desk, we recommend that it is assembled by two adults, on a carpeted or
padded area, in the room that it is intended for. Approximate assembly time: 30 minutes.
3.Please do not use any tools other than those provided or recommended in these instructions.
4.Please do not throw away any of the packaging or instructions until you have checked all the components and
hardware and the furniture is fully assembled.
5.Assemble all components loosely until advised to tighten. Depending on use, it may be necessary to tighten the
components from time to time, so please save the tools that have been provided.
6.Please keep all pieces out of reach of small children.
Component:
1
3
(with three pre-drilled holes)
5
Customer Service 908-368-1025︱www.modwayfurniture.com
Glass Top
x1
Right Leg
x1
Central Rail
x1
Hardware:
A
B
C
D
E
F
G
H
2
Drawer Box
4
Left Leg
(with one pre-drilled hole)
Bolt M8x60mm
x2
Bolt M8x40mm
x2
Bolt M8x30mm
x2
Bolt M8x10mm
x16
Washer
x2
Flat Washer
x20
Plastic Cap
x2
Allen Wrench
x1
x1
x1
Page 1 of 4

Advertisement

loading
Need help?

Need help?

Do you have a question about the STASIS EEI-1181 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for modway STASIS EEI-1181

  • Page 1 EEI -1181 STASIS OFFICE DESK Thank you for purchasing the MODWAY STASIS OFFICE DESK! Before you start, here is some helpful advice: 1.We suggest you spend a short time reading through this leaflet and then follow the simple step by step instructions.
  • Page 2 EEI -1181 STASIS OFFICE DESK STEP 1: Place the Left Leg (4) to the Central Rail (5) as shown. Please make sure that the concave surface of each Washer (E) faces to the head of each Bolt (A) when connecting. Attach them by using Bolts (A) and Washers (E) through the pre-drilled holes on the Central Rail (5) and the Left Leg (4).
  • Page 3 EEI -1181 STASIS OFFICE DESK STEP 3: In order to properly attach the Drawer Box (2) to the side of the Right Leg (3), take out the extra space before leg. It will be necessary to remove the two drawers from the Drawer Box (2). Please follow the following steps for drawer removal. A, Open the drawer fully.
  • Page 4 EEI -1181 STASIS OFFICE DESK STEP 5: In order to return the two drawers into the Drawer Box (2). A, Align drawer with drawer slides. B, Move silver metal carrier fully forward in slide. C, Gently push drawer into the drawer box. Silver Metal Carrier Align drawer with drawer slides.

This manual is also suitable for:

Stasis eei-1181-whi