Commissioning, inspection, maintenance
Checking the connections and inspection ports...
Note
If the optional thermal insulation is fitted, this must first be removed.
A
C
C
Fig. 19
Caution - hot surface!
Inspection ports
A
Handhole
C
Note
If the optional thermal insulation is fitted, this must first be removed.
Checking the water level and system pressure
Checking the safety and control equipment
Manufacturer's documentation for safety and
control equipment
Checking the safety valve
Manufacturer's documentation for the safety
valve
Checking the water quality
Document the top-up volume and overall hardness of
the boiler water.
Checking the thermal insulation
Checking the installation room ventilation
Checking the flue pipe for leaks
28
C E
Headhole
D
Manhole
E
See chapter "Standard values for water quality" on
page 9
(cont.)
D