Floor mounted, gas-fired condensing boiler with matrix gas burner and lambda pro control, for operation with natural gas and liquid propane gas, heating input 19 to 199 mbh, 5.6 to 58 kw, with vitotronic 200 kw6b controls (44 pages)
Vr2 series oil-fired boiler, hot water heating boiler 77 to 245 mbh / 23 to 72 kw, with boiler stand and vitocell-v 100 domestic hot water storage tank (17 pages)
Viesmann Installation instructions for contractors Vitomax HW Type M70 Type M72 Type M74 Type M92 Type M94 Type M96 High pressure hot water boilers VITOMAX HW 5777858 GB 1/2019...
Work on electrical equipment may only be carried ■ out by a qualified electrician. ■ The commissioning must only be carried out by trained specialist personnel in accordance with the Viessmann operating and service instructions. Regulations to be observed ■ Pressure Equipment Directive ■ National installation regulations...
Preparing for installation Symbols The steps in connection with commissioning, inspec- Symbol Meaning tion and maintenance are found in the "Commission- Reference to other document containing ing, inspection and maintenance" section and identified further information as follows: Step in a diagram: Symbol Meaning The numbers correspond to the order in...
Use the appropriate amount of desiccant for the vol- ■ ume of the boiler. General Note ■ Store Viessmann shell boilers in closed rooms, pro- Observe the desiccant manufacturer's instructions. tected from weather influences and under dry condi- ■ Check the effectiveness of the desiccant at regular tions.
Preparing for installation (cont.) Transporting a shell boiler Danger Inappropriate handling of the boiler may lead to accidents. There is a risk of injury. Only use the slinging points. Observe all the applicable regulations on accident prevention. F1/2 F1/2 Fig. 1 Slinging points/tie-down options Holes for lifting gear ( 80 mm)
Handling and levelling the boiler Recommended minimum clearances 1000 ≥ Subject to the selected control panel ≥ ≥ ≥ ≥ Tab. 1 Recommendation for dimension f Leave one boiler length (x1) of space in front of the y1/2 boiler door to extract the turbulators (if fitted) and for cleaning.
Boiler connections (cont.) Boiler size 13 bar PN 40 DN 16 bar PN 40 DN 18 bar PN 40 DN 20 bar PN 40 DN Tab. 11 Installing the pipework Danger Please note Risk of injury when opening pressurised boiler Unsuitable water quality can damage the boiler flue connections.
Installing the pipework (cont.) Note Observe designation for boiler flow and boiler return connectors on the boiler. Note Install all pipe connections free of load and torque stress. 1. Thoroughly flush the system (especially when con- 2. Connect all pipework. necting the boiler to an existing system).
Connections on the flue gas side (cont.) External diameter, flue pipe Boiler size M70A – M72B M74B 1110 1110 – M92A – 1110 1110 M94B – 1110 M96A – Note on condensate drain ■ Condensate will form in the flue system. Return of this condensate must be prevented on site.
Installing the burner (cont.) 1. For burner connection, secure burner plate the boiler flange with screws. 2. Secure the burner to the burner plate with screws. Note For differing dimensions, trim the cut-out in the thermal insulation according to the flame head diameter.
Page 17
Adjusting the burner (cont.) Boiler size With natural gas for 8.73 9.83 10.94 13.04 15.25 17.40 19.60 21.33 – ■ smooth pipe With natural gas for corru- 8.73 9.83 10.94 13.04 15.25 17.40 19.61 21.82 23.20 ■ gated pipe With EL fuel oil for smooth 8.48 9.15 9.81...