Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
•
•
•
1. Commissioning the system............................................................................................... 20
•
•
2. Shutting down the system................................................................................................. 21
•
3. Removing the burner (if required).................................................................................... 21
•
•
4. Opening the boiler door(s)................................................................................................ 22
•
•
5. Removing the inspection port closures........................................................................... 22
•
6. Removing and cleaning the turbulators (if installed)..................................................... 23
•
7. Cleaning the heating surfaces and flue gas collector.................................................... 23
•
•
•
8. Checking the gaskets and packing cords on the flue gas side
•
•
9. Cleaning the sight glass.................................................................................................... 23
•
•
•
10. Checking the thermal insulation components and gaskets........................................... 24
•
•
•
11. Inserting turbulators (if installed) and closing boiler door(s)........................................ 25
•
•
•
12. Closing and securing the inspection ports..................................................................... 25
•
•
13. Mounting the burner (if required)..................................................................................... 26
•
14. Checking the water chamber for deposits (M62, M82)................................................... 27
•
•
15. Checking the connections and inspection ports on the water side for leaks.............. 27
•
•
•
16. Checking the water level and system pressure
•
•
•
17. Checking the safety and control equipment.................................................................... 28
•
•
•
18. Checking the safety valve................................................................................................. 28
•
•
19. Checking the water quality................................................................................................ 28
•
•
20. Checking the thermal insulation
•
•
•
21. Checking the installation room ventilation
•
•
•
22. Checking the flue pipe for leaks
•
•
23. Adjusting the burner.......................................................................................................... 29
Commissioning, inspection, maintenance
Page
19