Routing Cables Through The Cable-Management Arm And Connecting Expansion Units; Completing Server Setup - IBM S824L Installing

Table of Contents

Advertisement

1) Connect the system power cords from the server and I/O drawers to the PDU with an IEC 320
type receptacle.
2) Attach the PDU input power cord and plug it into the power source.
3) If your system uses two PDUs for redundancy, complete the following steps:
v If your system has two power supplies, attach one power supply to each of the two PDUs.
v If your system has four power supplies, plug E1 and E2 to PDU A and E3 and E4 to PDU
B.
Note: Confirm that the system is in standby mode. The green power status indicator on the
front control panel is flashing, and the dc out indicator lights on the power supplies are
flashing. If none of the indicators are flashing, check the power cord connections. For details,
see "Common system attention LEDs and system reference codes" on page 21.
3. Wait for the green light on the control panel to start flashing.
4. Ensure that your ASCII terminal is set to the following general attributes.
These attributes are the default settings for the diagnostic programs. Be sure that your terminal is set
according to these attributes before proceeding to the next step.
Table 3. Default settings for the diagnostic programs
General setup attributes
Line speed
Word length (bits)
Parity
Stop bit
5. Press a key on the ASCII terminal to allow the service processor to confirm the presence of the ASCII
terminal.
6. When the login display appears for the ASMI, enter admin for the user ID and password.
7. Change the default password when you are prompted.
8. Press Enter until the server information appears. You have completed the setup for an ASCII terminal,
and have started the ASMI.
9. Continue with "Completing server setup."
Routing cables through the cable-management arm and connecting expansion
units
Use this procedure to route cables through the cable-management arm and to connect expansion units.
To route cables through the cable-management arm and to connect expansion units, complete the
following steps:
1. Route the console cable through the cable management arm.
2. Continue with "Completing server setup."

Completing server setup

Use this procedure to complete your server setup.
To complete the server setup, complete the following steps:
18
Power Systems: Installing the IBM Power System S824L (8247-42L)
3151 /11/31/41
3151 /51/61
settings
settings
19,200
19,200
8
8
No
No
1
1
3161 /64
settings
Description
19,200
Uses the 19,200 (bits per second) line
speed to communicate with the system
unit.
8
Selects 8 bits as a data word length
(byte).
No
Does not add a parity bit and is used
together with the word length attribute
to form the 8–bit data word (byte).
1
Places a bit after a data word (byte).