IBM S824L Installing page 32

Table of Contents

Advertisement

Figure 16. Removing the shipping bracket from the rear of the chassis
Store the shipping bracket if you want to move your system at a later date.
2. Cable the server.
a. Plug the power cords into the power supplies and attach the cables to the handles on the power
supplies using cable ties or hook-and-loop fasteners.
16
Power Systems: Installing the IBM Power System S824L (8247-42L)

Advertisement

Table of Contents
loading

This manual is also suitable for:

8247-42l

Table of Contents