Wall Mount Installation - Empire Heating Systems BF-10W-1 Installation Instructions Manual

Unvented room heaters
Table of Contents

Advertisement

Refer to Figures 6 and 7 for measurements in order to locate (4) mounting holes on wall. Figures 6 and 7 are the front views of the heater.
1.
Remove lower louver from casing assembly (2 screws).
2.
Remove reflector from casing assembly (2 screws).
3.
Remove upper louver from casing assembly (2 screws).
On Solid Wall
1.
After locating mounting holes, attach (4) #10 x 1" (25mm) screws provided into the wall. Do not completely tighten screwheads to the
wall, leave a 1/8" (3mm) gap between screwheads and wall.
2.
Mount heater onto the (4) screwheads and complete tightening screwheads into the wall.
Attention! Use the following steps to properly align the upper louver and the reflector with the heat shield.
a.
When replacing upper louver, be sure the bottom lip of upper louver goes behind the heat shield.
b.
When replacing reflector, be sure the top lip of reflector goes in front of the heat shield.
3.
Connect the gas line.
18" (457mm)
2"
14" (356mm)
(51mm)
1 3/32"
(28mm)
OUTLINE OF
OUTER CASING
18 7/8"
(479mm)
2 1/32" (52mm)
4 1/32"
(102mm) MIN.
MOUNTING HOLE LOCATIONS
VIEWED FROM FRONT OF HEATER
On Sheet Rock Wall
1.
After locating mounting holes, drill (4) 5/16" (8mm) diameter
holes into the wall.
2.
Insert (4) plastic expansion anchors provided into the holes.
3.
Tighten (4) #10 x 1" (25mm) screws provided into the plastic
expansion anchors. Do not completely tighten screwheads to
the plastic expansion anchors, leave a 1/8" (3mm) gap between
screwheads and plastic expansion anchors.
4.
Mount heater onto the (4) screwheads and complete tightening
the screwheads to the plastic expansion anchors.
Attention! Use the following steps to properly align the upper
louver and the reflector with the heat shield.
a.
When replacing upper louver, be sure the bottom lip of
upper louver goes behind the heat shield.
b.
When replacing reflector, be sure the top lip of reflector
goes in front of the heat shield.
5.
Connect the gas line.
39892-4-0719

WALL MOUNT INSTALLATION

2"
(51mm)
(559mm)
2" (51mm) MIN.
FLOOR
Figure 6
BF-10 and BF-20
2"
(51mm)
1 3/32"
(28mm)
18 7/8"
22"
(479mm)
4 1/32"
(102mm) MIN.
VIEWED FROM FRONT OF HEATER
24 1/8" (613mm)
20 1/8" (511mm)
OUTLINE OF
OUTER CASING
2 1/32" (52mm)
FLOOR
MOUNTING HOLE LOCATIONS
BF-30
Figure 7
Figure 8
2"
(51mm)
22"
(559mm)
2" (51mm) MIN.
Page 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bf-20w-1Bf-30w-1

Table of Contents