Mitsubishi Electric VL-250CZPVU-L-ERT Handbook page 51

Lossnay heat recovery ventilator
Table of Contents

Advertisement

[3] Remove the front casing (OUT).
a. Remove the screws from the bottom side.
( 2 screws: Special (spl) screw PT 4x10 (painted), indi-
cated by
)
Tightening torque
: 1.5 ± 0.2 N . m
b. Open the bottom part of the front casing (OUT) a little
bit, and raise it diagonally upward to unhook the top
hook.
Precaution
Do not remove the screws (indicated by
top of the front casing (OUT).
) on the
─ 51 ─
Front casing (OUT)
Front casing (OUT)
Front casing (OUT)

Advertisement

Table of Contents
loading

Table of Contents