Phase 2
(1)-ENTRANCE SUB-ASSEMBLY
NOTE:
ALIGN THE 'L' ONE HOLE TO THE LEFT OF SEAM TO ACHIEVE THE
•
PROPER POSITION WHEN ASSEMBLING THE SLIDE.
•
NOTE THIS SECTION ASSEMBLY USES CONFIGURATION 'A' SHOWN
IN THE REFERENCE PAGE.
TIP:
•
USE A SCREW DRIVER TO ALIGN HOLES.
ELBOW TUBE
SUB-ASSEMBLY
LEFT SIDE VIEW
A4M00996
TUBE SLIDE BRACKET
(x6)
(1)-STRAIGHT TUBE SUB-ASSEMBLY
148
(x12)
NUT - 1/4"
769
(x12)
BOLT - 3/4"
ENTRANCE SUB-ASSEMBLY
STEP 1
H100769
(x12)
"L" TO LEFT OF SEAM
996
(x6)
TUBE SLIDE BRACKET
TOP VIEW
BOLT PTH WZ
1/4x3/4
H100148
NUT LOCK WZ
(x12)
1/4