Page 1
WE-EF LEUCHTEN Installation and Maintenance Instructions Bollard QSI254 LED Surge Protection This product features built-in surge protection circuitry in compliance with applicable standards. For comprehensive protection of a luminaire installation against lightning and electrical surges, it is essential to cover mains supply and data input lines at the distribution board level, by using respective primary (Type 1) and secondary (Type 2) surge arrestors in compliance with EN61643-11/IEC61643-1.
Page 2
Bollard QSI254 IP55, Class I, ta = 40°C Accessories: Planted root – Galvanised steel. ESV4 for QSI254 300-0459 ESV4...
Light Source Maintenance Apart from cleaning the product’s exterior surfaces, no special maintenance work is required. Do not use high-pressure cleaners. In case of component failure due to abnormal circumstances or at end of life, replacement must be carried out by a suitably quali ed and trained professional.
G (not supplied by excluded. WE-EF). Place watertight terminal connector G and excess cable in post H. 6) Set luminaire in position and secure by inserting and tightening bolts I.
Installation Instruction 1) Note: It is the responsibility to installer to 2) Please note, ESV4 and ESV6 must be ensure the suitability of the ESV planted root orientated correctly for different products. for any local or national structural requirements In both instances conduit entry can be rotated for installation, and that planted root is suitable to match cable routing.
Page 12
5) For all other product that use ESV6 please orientate planted root as shown (base plate connections/conduit. is parallel to the pathway). For this installation, use 40 mm long M16 bolts supplie. 7) Place the ESV in the form work for concrete 8) Fit the nominated bolts through mounting pad, ensuring orientation, position and levels are correct.
Page 13
9) Pour concrete to desired level depending on requirement of soil, paver or concrete. Ensure (as per luminaire instructions) onto mounting Concrete Paver Soil...