Table Of Contents; About The Documentation; About This Document; About The Box - Daikin Altherma EHVZ-CB3V Installation Manual

Table of Contents

Advertisement

Table of Contents

1.1
About this document..................................................................
2.1
Indoor unit .................................................................................
2.1.1
3.1
Preparing the installation site ....................................................
3.1.1
3.2
Preparing water piping ..............................................................
3.2.1
3.3
Preparing electrical wiring .........................................................
3.3.1
internal actuators ........................................................
4.1
Opening the units ......................................................................
4.1.1
To open the indoor unit ...............................................
4.1.2
4.2
Mounting the indoor unit............................................................
4.2.1
To install the indoor unit..............................................
4.3
Connecting the refrigerant piping ..............................................
4.3.1
4.4
Connecting the water piping......................................................
4.4.1
To connect the water piping........................................
4.4.2
To connect the recirculation piping .............................
4.4.3
To fill the water circuit .................................................
4.4.4
To fill the domestic hot water tank ..............................
4.4.5
To insulate the water piping ........................................
4.5
Connecting the electrical wiring.................................................
4.5.1
About electrical compliance ........................................
4.5.2
4.5.3
To connect the main power supply .............................
4.5.4
4.5.5
To connect the user interface .....................................
4.5.6
To connect the shut-off valve...................................... 10
4.5.7
To connect the electrical meters ................................. 10
4.5.8
4.5.9
To connect the alarm output ....................................... 11
4.5.10
4.5.11
4.5.12
contact) ....................................................................... 11
4.6
Finishing the indoor unit installation .......................................... 12
4.6.1
4.6.2
To close the indoor unit............................................... 12
5.1
Overview: Configuration ............................................................ 12
5.1.1
To access the most used commands ......................... 13
5.2
Basic configuration .................................................................... 13
5.2.1
5.2.2
Quick wizard: Standard............................................... 14
5.2.3
Quick wizard: Options ................................................. 14
5.2.4
5.2.5
Space heating control ................................................. 16
5.2.6
Domestic hot water control ......................................... 17
5.2.7
Contact/helpdesk number ........................................... 17
5.3
Menu structure: Overview installer settings............................... 18
6.1
Checklist before commissioning................................................ 19
6.2
Checklist during commissioning ................................................ 19
6.2.1
To check the minimum flow rate ................................. 19
6.2.2
To perform an air purge .............................................. 20
EHVZ04~16S18CB3V
Daikin Altherma - Low temperature split
4P401672-1E - 2018.02
6.2.3
To perform a test run ................................................... 20
6.2.4
To perform an actuator test run ................................... 20
6.2.5
3
3
8.1
Piping diagram: Indoor unit ........................................................ 21
3
8.2
Wiring diagram: Indoor unit ........................................................ 23
3
3
1

About the documentation

4
4
4
1.1

About this document

4
4
Target audience
5
Authorised installers
5
Documentation set
5
This document is part of a documentation set. The complete set
consists of:
5
5
▪ General safety precautions:
6
▪ Safety instructions that you must read before installing
6
6
▪ Format: Paper (in the box of the indoor unit)
6
▪ Indoor unit installation manual:
6
▪ Installation instructions
6
6
▪ Format: Paper (in the box of the indoor unit)
7
▪ Outdoor unit installation manual:
7
▪ Installation instructions
7
8
▪ Format: Paper (in the box of the outdoor unit)
8
▪ Installer reference guide:
8
8
▪ Preparation of the installation, good practices, reference data,...
8
▪ Format: Digital files on
9
and-manuals/product-information/
9
▪ Addendum book for optional equipment:
▪ Additional info about how to install optional equipment
▪ Format: Paper (in the box of the indoor unit) + Digital files on
http://www.daikineurope.com/support-and-manuals/product-
information/
Latest revisions of the supplied documentation may be available on
the regional Daikin website or via your dealer.
The original documentation is written in English. All other languages
are translations.
Technical engineering data
12
▪ A subset of the latest technical data is available on the regional
Daikin website (publicly accessible).
▪ The full set of latest technical data is available on the Daikin
extranet (authentication required).
2

About the box

2.1

Indoor unit

2.1.1
To remove the accessories from the
19
indoor unit
1 Remove the screws at the top of the unit.
2 Remove the top panel.
Table of Contents
http://www.daikineurope.com/support-
Installation manual
21
21
3

Advertisement

Table of Contents
loading

Table of Contents