All Air Energy™ heat pumps must be installed in
accordance with the local building and installation
codes as per the utility or authority having
jurisdiction. All local codes take precedence over
national codes.
1.5

Technical Assistance

Consult your local Air Energy™ dealer with any
questions or problems involving the specifications,
installation, and operation of your Air Energy™
equipment.
1.6

Materials Needed For Installation

1.6.1

Materials for All Installations

The following items are needed and are to be
supplied by the installer for all heat pump installations:
1.
Plumbing connections: 2" connections with 50
mm adaptors.
2.
Level surface for proper drainage.
3.
Suitable electrical supply line (See Table 1). See
rating plate on unit for electrical specifi cations.
A junction box is not needed at the heat pump;
connections are made inside of the heat pump
electrical compartment. Conduit may be attached
directly to the heat pump jacket.
NOTE A fl exible type of conduit approved by local
installation codes is recommended for
connecting the electrical supply wires to the
heat pump so that the front panel may be
removed easily for servicing.
4.
Electric cutout (Disconnect) switch that will
interrupt all power to the unit. This switch must be
within line of sight of the heat pump.
5.
Watertight conduit to run the electrical supply line.
Table 1.
Recommended Minimum Cross-Sectional
Area of Conductors of Supply Wiring
Rated Current of
Appliance
(A)
> 10 and ≤ 16
> 16 and ≤ 25
> 25 and ≤ 32
> 32 and ≤ 40
> 40 and ≤ 63
NOTE
The minimum cross-sectional area provided for the supply
conductors are recommendations only. Always consult the
local and applicable standards and codes to confi rm that
the installation is in compliance with all applicable rules and
regulations.
Nominal Cross-Sectional
Area of Each Conductor
2
(mm
)
0.75
2.5
4
6
10
1.6.2
Recommended Materials for
Installations
Air Energy™ recommends installing isolation
valves on the inlet and outlet water connections for ease
of serviceability.
1.7
Specifi cations
1.7.1
General Specifi cations
Installation Location
CE Approved for use in:
UK
France
Germany
Portugal
Spain
Italy
Water Pipe/Heater Connection
Plastic
Flow Rate
Maximum
Optimum
Minimum
Maximum Working Water
Pressure
Electrical Supply
Voltage Requirements
1-Phase
3-Phase
Acceptable Enviromental
Operational Conditions
Ambient Temperature Range
Pollution Degree
1.7.2

Dimensions

See Figure 1 for a diagram showing the heat
pump's dimensions and for dimensions to critical
connections.
Page 7
Indoor/Outdoor
Indoor/Outdoor
Indoor/Outdoor
Indoor/Outdoor
Indoor/Outdoor
Indoor/Outdoor
2" PVC (Unions
included) with
50 mm adaptors
3
28 m
/hr
12 m
3
/hr
3
6 m
/hr
5 bars (75 psi)
208-230 VAC 50Hz
380-420 VAC 50Hz
0°C (32°F) - 65°C