Follett C19999 Operation And Service Manual page 22

Table of Contents

Advertisement

6. Orient auger shaft with keyway in the
upward position.
7.
Force main housing into position against evaporator
and place 1/4" (7mm) diameter Phillips screwdriver
into hole in the auger shaft.
8. Replace V-band clamp as shown.
9. Replace nut on V-band clamp and tighten.
10. Remove screwdriver.
11. Reconnect transport tube to louvered
docking assembly.
12. Plug sensor in at the electrical box.
13. Reconnect vent tube to the shuttle housing
as shown.
14. Apply a coat of petrol-gel compound to the auger
shaft.
15. Install gearmotor, making sure that insulation is
properly seated between gearmotor and main
housing as shown.
16. Firmly tighten four gearmotor bolts in place.
17. Insert a bolt into the auger shaft and finger tighten.
Fig. 21
Fig. 22
Fig. 23
petrol-gel
22
Note: Shuttle housing
removed for clarity
Apply

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hcd1400nHcd1400r

Table of Contents