Pipe work connections to boiler are fitted correctly.

All necessary isolation valves are open.

Condense connections on boiler and flue are connected and piped to drain.

Heat load is available.

6.4 Flue

Ensure that;

Flue system is correctly designed and installed to suit boilers.

Flue passages to chimney are clear.

6.5 Electrical

Ensure that;

Electrical connections are correct and isolatable.

External controls are operational.
WARNING: WHEN THE FRONT COVER IS REMOVED AND THE BOILER IS
OPERATIONAL, CARE MUST BE TAKEN WITH ELECTRICAL COMPONENTS AND
HAMWORTHY HEATING LTD
ACCESS TO PRIMARY INSULATION.
FLEET W series
21
500001211/F

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F40wF50wF60wF70wF85wF100w ... Show all

Table of Contents