Follett Horizon Elite 1410 Series Operation And Service Manual page 26

Remote condensing
Hide thumbs Also See for Horizon Elite 1410 Series:
Table of Contents

Advertisement

22. Install shuttle switch.
§ Align holes with pins (Fig. 23.1) and depress switch
button (Fig. 23.2) to clear shuttle tab.
23. Install shuttle drain tube and front feed water tube
(Fig. 24).
24. Install main housing insulation and shuttle insulation:
25. Apply a coat of petro gel to auger shaft.
26
Fig. 23
Fig. 24
Fig. 25
HCD1010R/N, HMF1010R/N, HCD1410R/N, HMF1410R/N

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents