LG WK2 S6 Series Owner's Manual page 20

Laundry center
Table of Contents

Advertisement

INSTALLATION
20
4
Thread the 4-wire #10 AWG minimum copper
power cable prepared in step 1 through the
strain relief.
a
Terminal Block
UL-Listed Strain Relief
b
c
UL-Listed 4-Wire Power Cord
5
Transfer the appliance's ground wire from
behind the green ground screw to the center of
the terminal block.
6
Attach the two hot leads (black and red) of the
power cord to the outer terminal block screws.
7
Attach the neutral (white) wire to the center
screw of the terminal block.
8
Attach the power cord ground wire to the
green ground screw.
9
Tighten all screws securely.
10
Reinstall the terminal block access cover.
b
e
d
a
White Wire moved from Ground Screw
b
Hot Leads of Power Cord (Black and Red)
a
b
c
c
b
a
c
Neutral Wire (White)
Power Cord Ground Wire
d
Ground Screw (green)
e
Three-Wire Power Cord
• A 3-wire connection is NOT
permitted on new construction
after January 1, 1996.
• A UL-listed strain relief is required.
• Use a 30-amp, 240-volt, 3-wire, UL-listed
power cord with #10 AWG-minimum copper
conductor and closed loop or forked
terminals with upturned ends.
1
Remove the terminal block access cover on the
upper back of the appliance.
2
Install the UL-listed strain relief into the power
cord through-hole.
3
Thread a 30-amp, 240 volt, 3-wire, UL-listed
power cord with #10 AWG-minimum copper
conductor through the strain relief.
Terminal Block
a
UL-Listed Strain Relief
b
c
UL-Listed 3-Wire Power Cord
4
Attach the two hot leads (black and red) of the
power cord to the outer terminal block screws.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wk22ws6Wk22bs6

Table of Contents