4| Compressor assembly

4.1 Storage and transportation
?

4.2 Setting up

3

4.3 Pipe connections

ung
Zeichn.-Nr.
Teile-Nr.
INFO
New compressors are factory-filled with inert gas. Leave this
service charge in the compressor for as long as possible and pre-
vent the ingress of air. Check the compressor for transport damage
before starting any work.
Storage at (-30°C) - (+70°C), maximum permissible relative humidity
10% -95 %, no condensation.
Do not store in a corrosive, dusty, vaporous atmosphere or in a com-
bustible environment.
Use transport eyelet.
Do not lift manually!
Use lifting gear!
ATTENTION
Attachments (e.g. pipe holders, additional units, fastening parts,
etc.) directly to the compressor are not permissible!
2
Provide adequate clearance for maintenance work.
Ensure adequate compressor ventilation.
Do not use in a corrosive, dusty, damp atmosphere or a combustible
environment.
Setup on an even surface or frame with sufficient load-bearing
capacity. Only erect on a slant in consultation with the manufacturer.
Single compressor preferably on vibration damper.
Duplex and parallel circuits always rigid.
Sun protection: If the compressor is set up outdoors, it has to be
protected from direct sunlight.
ATTENTION Damage possible.
Superheating can damage the valve.
Remove the pipe supports therefore from the valve for soldering
and accordingly cool the valve body during and after soldering.
Only solder using inert gas to inhibit oxidation products (scale).
Zone
Änderungs-Nr.
Blatt:
Maßstab:
Ausgangsteil, bzw. Rohteil:
-
Werkstoff:
1
F
E
D
C
Datum
Bearb.
Gepr.
B
-
D
GB
F
E
9

Advertisement

Table of Contents
loading

Table of Contents