Hardware Installation - Vivotek ND9312 User Manual

For crowd control solution
Table of Contents

Advertisement

VIVOTEK - Built with Reliability
IMPORTANT:
It is important to leave a clearance of 10cm around the chassis. The clearance is required to
ensure an adequate airflow through the chassis to ventilate heat.
To ensure normal operation, maintain ambient airflow. Do not block the airflow around chassis
such as placing the system in a closed cabinet.

Hardware Installation

2
SATA hard disk(s) are user-supplied. The network video recorder can readily accommodate
most of the off-the-shelf SATA hard drives.
1. Use a Phillips screwdriver to loosen the retention screws from the bottom of the chassis. Re-
move the top cover.
User's Manual - 11

Advertisement

Table of Contents
loading

Table of Contents