Download Print this page

AEMC instruments 3640 Quick Start Manual page 3

Advertisement

Connect to the Grounding System
STEP 3:
Following the diagram, perform the below steps in the following order:
1
2
3
4
5
6
NOTE: X3 is not needed if the pump is mounted to a fire truck.
7
8
9
Begin the transfer process.
AEMC
Instruments • (800) 945-2362 •
®
Connect a grounding cable to the distressed tanker first and then to
its grounding system X1.
Connect a grounding cable to the recovery tanker first and then to its
ground system X2.
Connect a grounding cable to the transfer pump first and then to its
grounding system X3.
Connect a bonding cable to the distressed tanker first and then to
the recovery tanker.
Connect the hoses to the pump and tankers.
www aemc.com
99-MAN 100438v3

Advertisement

loading
Need help?

Need help?

Do you have a question about the 3640 and is the answer not in the manual?