Positioning The Draught Terminals - Biasi RINNOVA ADAPTIVE User Manual And Installation Instructions

Table of Contents

Advertisement

The materials the pipes are made
from must be suitable for use with
this type of appliance.
The straight sections must not be
deformed and must be suitably
supported.
The joints must be sealed and pro-
tected against unthreading.
Insert the flue-gas draw stub kit
above the boiler.
Figure 5.15

5.10 Positioning the draught terminals

The draught terminals must:
• be positioned on the outer perimeter walls
of the building or on the roof;
- 40 -
INSTALLATION
• comply with the minimum distances Figure
5.16 and any national or local regulations.
Position of the terminal
A Under the window or other open-
ing
B Next to a window or door
B Next to an air vent or ventilation
opening
C Side of a balcony
D Under the gutter or discharge
pipes
E Under the eaves
F Under balconies
G Under the garage roof
H From vertical discharge pipes
I
From inner corners
J
From external corners
K From the ground or other floor
surfaces
L
From a front facing surface with-
out openings
M From a front facing opening
N From an opening in the garage
O Between two vertical terminals in
the same wall
P Between two horizontal termi-
nals in the same wall
Q Above the pitch of a roof with a
slope less than or equal to 30° *
Q Above the pitch of a roof with a
slope greater than 30° *
R Above a flat roof *
S From a wall *
S From two walls at an angle *
* Roof-mounted terminal
mm
600
400
600
1000
300
300
300
NO
300
300
300
2200
2000
3000
NO
1500
1000
350
600
300
600
1000

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M300v.2025 smM300v.3035 sm

Table of Contents