Chapter 3: Testing the Ionizer
With the ionizer installed and ready to go, now Power-Up the system and verify functionality.
Verify Air and Power
1. With the air supply ON, ensure the air pressure regulator shows a reading between the green
markers of 0.10 and 0.14 MPa (15 - 20 PSI).
Verify reading on air pressure regulator.
2. On the back of the ionizer, verify that the IONizer and MAINtenance lights are both GREEN.
Verify GREEN status lights.
PSV7000 Ionizer Kit
15 |
P a g e
Need help?
Do you have a question about the PSV7000 and is the answer not in the manual?
Questions and answers