SERVICE
This section provides procedures for testing and
replacing various major components used in this
brewer should service become necessary. Refer to
Troubleshooting for assistance in determining the
cause of any problem.
WARNING - Inspection, testing, and repair of electri-
cal equipment should be performed only by qualified
service personnel. The brewer should be unplugged
when servicing, except when electrical tests are re-
quired and the test procedure specifically states to
plug-in the brewer.
COMPONENT ACCESS
WARNING - Disconnect the brewer from the power
source before the removal of any panel or the replace-
ment of any component.
All components are accessible by the removal of
the top cover, front inspection panel and warmer base
plate.
The top cover is attached with one #4-40 slotted
head screw.
The front inspection panel is attached with four #6-
32 slotted head screws.
The server plateform is attached with seven #6-32
slotted head screws.
Bypass Valve ........................................................ 15
Dispense Valve ..................................................... 22
ON/OFF Switch...................................................... 31
Tank Heater .......................................................... 36
Timer ............................................................... 38,40
Page 14
AT
ER
T W
HO
IO
N
UT
E S
CA
U R
!
E D
O C
P R
G
if
.
IN
si ze
br ew
A T
rv er
s to
E R
O P
ck
Se
re fu
se
C he
± 5°
er
ew
0° F
1.
Br
ew
s Br
al d'
re :
20
on
M cD
ra tu
m pe
)
2.
Te
8- 96
(3 -1
N
ER
IO
NT
U T
D DE
CA
C A
AR
DI SC
!
IF :
D
KE
D
. CR
AC
HE
Y
RA
TC
Y
PT
. SC
D
DR
EN
EM
E
ILE
WH
FL
AM
IC
. BO
ED
H
TR
. HE
AT
ON
HIG
EL
EC
ED
SE
JU
D
RY
TS
. US
PO
S IN
ON
EN
EX
SK
TS
OR
ATI
NT
. OR
Y RI
EN
CO
RP
CO
T
M PL
EL
EM
MA
TIC
EL
E HO
-O-
NN
CO
5 BU
NN
FU
AR
E TO
198
IL UR
FA
: 658
PN
Contents
P1014
27118 100400